SAP PM/CS / EAM : Refurbishment Process


Refurbishment
A refurbishment order is a standard Maintenance Order type. In customizing for order, we first create an order type ( such as PM04)
In the configuration we have to create a new order type in OIOA and activate this for Refurbishment process.



Process flow:




Business process steps

1. Damaged equipment/ spares if can be repaired will be done by the PM order of type PM04
2. Equipment/Spares needs repairing should have the item code if it is serialized item then with the serial number.
3. Item should have the valuation type for repair category too.
4. Create PR through refurbishment order for repair of the item with split valuation type of repair. Proper G/L codes and order for the repair indent should be provided in the indent
5. After approval of the requisition, the requisition and item should be send to the stores/Purchase section for further actions.
6. Stock will get updated after MIGO of the item
7. The activity type cost to be added to the repaired material cost.

Pre-requisites

There are some prerequisites that needs to be done before creating refurbishment order
1. Split valuation should be active for material, for Most PM materials, valuation category is condition based in which different valuation types like OLD, REFURBISHED And NEW are used
2. Settlement profile for refurbishment order should have material as default object type as refurbishment order should always settle to material

1. DISPLAY MATERIAL MASTER


Call the transaction MM02 for the material in Plant 3000 and select Accounting View 1 to check the stock and material valuation for valuation types

For all the three valuation types like C1, C2, and C3
C1 is valuation type for New
C2 is valuation type for Repaired ( refurbished)
C3 is valuation type for Defective

2.  CREATE REFURBISHMENT ORDER

Call up the transaction code IW8W
With order type PM04
Planning Plant 1000
Material P-2001
Planner group
Main work center MECHANIK
The only difference of refurbishment order is , we have to enter some additional refurbishment-specific data for the material  such as
1. The quantity of parts to be refurbished with this material number
2. The actual condition of the material ( for example, C3 for defective parts)
3. Plant and storage location at which the material is stored in its actual condition
4. The target condition that should be achieved following refurbishment ( for example, C2 for refurbished parts)
5. Plant and storage location at which the material should eb stored in its target condition.


Maintain valuation type as C3 to C2 which means Defective to Refurbished
Add operations and components
The material to be provided is entered automatically as a ,material component in the COMPONENTS tab page. A material reservation is generated automatically for these materials.
The system has generated a material Reservation in Plant 1000 for the required quantity in Valuation type  C3 . The specified movement type is 261.
  

3. Setting an order to "In Process"

Call the transaction IW32 with the order #

As the PM technician, we first withdraw the reserved material from the warehouse. In the present example, the reserved material corresponds to five reserved Pumps with material number P-2001.
To carry out the material withdrawal with movement type 261 (goods issue for order), use MB1A. The goods issue applies to materials with valuation type C3
Before with Draw, make sure order should be put in process or Released status
After we have withdrawn the materials, carryout the refurbishment tasks. When we have done this, enter Time confirmation. In this example, we have not exceeded the scheduled working time for refurbishment.
Use IW41 transaction code to confirm the operation

HOW THE PM PLANNER TECHNICALLY COMPLETES ORDERS

After the PM technician has carried out final confirmations, we can check and  technically complete the refurbishment order.
Before TECO check whether the settlement rule as been assigned for the order.
By default the Settlement will happen to the Mater P-2001.
Settlement rule assigned to Order type in OIOA
And settlement Rule in OKOA

Check MMBE to compare the stock with all the three valuation types

POSTING GOODS RECEIPT FOR REFURBISHED ORDER TO WAREHOUSE

After the refurbished order is TECO, then we have to post the stock to the warehouse into the valuation type C2
Use transaction code IW8W
After the delivery, the order status changed to DEL

Once the Delivery is completed, the Order is debited with the Work hours and defective cost and credited with Refurbished cost

Price of Valuated stock at C2 is 1278.23 and for 5 quantities it is 6391.15. This cost is credited to the refurbished order.
After the Goods Issue, the quantity for C2 will be increased with 5


COST FLOW IN REFURBISHMENT ORDER

After Technical completion  has been carried out by the PM planner, the order is transferred to the controller for settlement. We carry out order settlement via Transaction KO88
Settlement showing the Sender and Receiver as below


Comments

  1. Refurbishment usually contains parts and work.
    Tax laws differs between parts and work.
    How to dissable Tax law violation, when execution of settlement?
    By the way: by point 2 TR-code is IW81 and not mentioned IW8W

    ReplyDelete

Post a Comment

Popular posts from this blog

TO MAKE INACTIVE CONDITION ACTIVE IN SAP

This blogger contains details on how to set an INACTIVE CONDITION  to ACTIVE while processing Sales Order content: 1.  BUSINESS REQUIREMENT Due to some legal restrictions in Russia, Russia Local Plant cannot hold any stock for the material and hence it is non valuated which means the Standard Price is Zero ( 0 $ ) The stock will be replenished from another company code and we used our Standard Third Party process  in which PR is created which will be converted to PO and when we do GR, the Standard Price of that plant is calculated in the GR. The baseline pricing structure is mapped in such a way that VPRS is calculated from the Material master and on which 15% markup is added as base price. Since the Cost price in VPRS condition is Zero Markup calculated on VPRS will be obviously calculates to Zero and both conditions were set as INACTIVE as per the condition properties 2.  CREATE SALES ORDER we will create a sales order for a material, whose standard Price

S4HANA-Project Systems Operative Indicators in WBS- CJ20N

  Use and Purpose of Operative Indicators in WBS elements When a customer Requests for ATO or ETO process where we create a Project with Integration between SD and PS ( project systems) As a First step we create a Project in CJ20N and under the Project we will Create Multiple WBS elements which has to be set for Operative Indicators This article deals with Operative Indicators in WBS elements. WE Use Operative Indicators to define characteristics of WBS and to specify which tasks WBS can perform during Execution In General, we have three Operative Indicators such as 1. Planning Indicator 2. Account Assignment Indicator 3. Billing Indicator Planning Element: WBS Elements will be set for planning Element,if we we want a plan cost to be enabled For Example, While Creating a Project- Manufacturing an Equipment. We will Create different WBS elements for each Level such as Design, Procurement of components, Production, Assembly and Installation. During Each state some cost is incurred and we