Skip to main content

SAP BRIM : Convergent Mediation -an Introduction

 

CM is SAP partners Product developed by Digital Route
Being used for Data Mediation of Usage and Consumption 
which implies

Ø a gathering of data from Multiple sources ,

ØFiltering,

ØConverting into  formatted data of SAP

Mediation Logic or rules for SAP CM are defined in the 
Workflow Object
CM Connects to SAP CC using two Agents

Ø SAP_CC_Batch

Ø SAP_CC_ONLINE


Ø SAP CM has three types of Agents

ØCollection

ØProcessing

ØForwarding



CM Data Flow






Collection Agent: 

This area captures the Data files  from different files , Databases, Devices and Network Elements. This can be either in RealTime or in Batch 




Process Agent:


The Data Collected in Collection Agent will be processed in this Agent. This Convert or Format the data into UDR - Usage Data Conversion

Data will be validated  for Duplicates, Footprints are removed, Enriched.


Forwarding Agent:

Data processed and Converted to UDRs will be Forwarded into CC ( or CI based on the Usage and system interface)


When the Charing is in Batch mode, BART server converts 
all the incoming CDRs into Chargeable Items and  transmits 
them to the Core Server

There are three Business services for Charging and rating


Online Charging or Office Charging

Event-Based Charging or session-based Charging

Stateless Rating

SAP_CC agent will communicate with CC system
The Data from CM will be eventually updated to Chargeable
 Items in CC

From CC, Charges will get determine and will fed to CI as 
Billable Item Classes





Comments

Post a Comment

Popular posts from this blog

SAP PM/CS / EAM : Refurbishment Process

Refurbishment A refurbishment order is a standard Maintenance Order type. In customizing for order, we first create an order type ( such as PM04) In the configuration we have to create a new order type in OIOA and activate this for Refurbishment process. Process flow: Business process steps 1. Damaged equipment/ spares if can be repaired will be done by the PM order of type PM04 2. Equipment/Spares needs repairing should have the item code if it is serialized item then with the serial number. 3. Item should have the valuation type for repair category too. 4. Create PR through refurbishment order for repair of the item with split valuation type of repair. Proper G/L codes and order for the repair indent should be provided in the indent 5. After approval of the requisition, the requisition and item should be send to the stores/Purchase section for further actions. 6. Stock will get updated after MIGO of the item 7. The activity type cost ...

TO MAKE INACTIVE CONDITION ACTIVE IN SAP

This blogger contains details on how to set an INACTIVE CONDITION  to ACTIVE while processing Sales Order content: 1.  BUSINESS REQUIREMENT Due to some legal restrictions in Russia, Russia Local Plant cannot hold any stock for the material and hence it is non valuated which means the Standard Price is Zero ( 0 $ ) The stock will be replenished from another company code and we used our Standard Third Party process  in which PR is created which will be converted to PO and when we do GR, the Standard Price of that plant is calculated in the GR. The baseline pricing structure is mapped in such a way that VPRS is calculated from the Material master and on which 15% markup is added as base price. Since the Cost price in VPRS condition is Zero Markup calculated on VPRS will be obviously calculates to Zero and both conditions were set as INACTIVE as per the condition properties 2.  CREATE SALES ORDER we will create a sales order for...

S4HANA-Project Systems Operative Indicators in WBS- CJ20N

  Use and Purpose of Operative Indicators in WBS elements When a customer Requests for ATO or ETO process where we create a Project with Integration between SD and PS ( project systems) As a First step we create a Project in CJ20N and under the Project we will Create Multiple WBS elements which has to be set for Operative Indicators This article deals with Operative Indicators in WBS elements. WE Use Operative Indicators to define characteristics of WBS and to specify which tasks WBS can perform during Execution In General, we have three Operative Indicators such as 1. Planning Indicator 2. Account Assignment Indicator 3. Billing Indicator Planning Element: WBS Elements will be set for planning Element,if we we want a plan cost to be enabled For Example, While Creating a Project- Manufacturing an Equipment. We will Create different WBS elements for each Level such as Design, Procurement of components, Production, Assembly and Installation. During Each state some cost is incurred an...