S4HANA CS/PM : MASS UPDATE OF FUNCTIONAL LOCATION - IL05


while we are working with Functional Location, sometimes we get a requirement from Business for Mass update of Functional Location

We will see how this can be done .

Call Transaction Code IL05--- Change Functional Location List



Enter the list of Functional Locations in the field 



After input of Functional Location, execute and it will extract the list of FL to be changed

Now call below navigation,

GOTOT-->CARRYOUT MASS CHANGE

Once we click on above function, a Pop-up will open which gives the option to change data in either of the below tabs

General Data
Organizational
Location Data


Assume that we have to change ABC CLASSIFICATION from Organization data



If you already have some existing value, it can be replace
Or if it is empty, you can update

here you can test before running Real time executing
you can check if the value fit ( sometime, for example plant data in general will have issues and you can sort out in Check or Test run)



Results during Real time Execution
👇👇



Which means, the update is successful , now we can check few records in IL02





The only difference in S4HANA and ECC is this Functionality of MASS update has to be enabled in ECC using  Business Functions
But in S4HANA, it is given embedded and no special Functions required to be activated


You can refer to Mass update of Equipment in below blog

https://santoshvemuri.blogspot.com/2020/04/mass-update-of-equipment-master-ie05.html

Comments

Popular posts from this blog

SAP PM/CS / EAM : Refurbishment Process

Refurbishment A refurbishment order is a standard Maintenance Order type. In customizing for order, we first create an order type ( such as PM04) In the configuration we have to create a new order type in OIOA and activate this for Refurbishment process. Process flow: Business process steps 1. Damaged equipment/ spares if can be repaired will be done by the PM order of type PM04 2. Equipment/Spares needs repairing should have the item code if it is serialized item then with the serial number. 3. Item should have the valuation type for repair category too. 4. Create PR through refurbishment order for repair of the item with split valuation type of repair. Proper G/L codes and order for the repair indent should be provided in the indent 5. After approval of the requisition, the requisition and item should be send to the stores/Purchase section for further actions. 6. Stock will get updated after MIGO of the item 7. The activity type cost ...

TO MAKE INACTIVE CONDITION ACTIVE IN SAP

This blogger contains details on how to set an INACTIVE CONDITION  to ACTIVE while processing Sales Order content: 1.  BUSINESS REQUIREMENT Due to some legal restrictions in Russia, Russia Local Plant cannot hold any stock for the material and hence it is non valuated which means the Standard Price is Zero ( 0 $ ) The stock will be replenished from another company code and we used our Standard Third Party process  in which PR is created which will be converted to PO and when we do GR, the Standard Price of that plant is calculated in the GR. The baseline pricing structure is mapped in such a way that VPRS is calculated from the Material master and on which 15% markup is added as base price. Since the Cost price in VPRS condition is Zero Markup calculated on VPRS will be obviously calculates to Zero and both conditions were set as INACTIVE as per the condition properties 2.  CREATE SALES ORDER we will create a sales order for...

S4HANA-Project Systems Operative Indicators in WBS- CJ20N

  Use and Purpose of Operative Indicators in WBS elements When a customer Requests for ATO or ETO process where we create a Project with Integration between SD and PS ( project systems) As a First step we create a Project in CJ20N and under the Project we will Create Multiple WBS elements which has to be set for Operative Indicators This article deals with Operative Indicators in WBS elements. WE Use Operative Indicators to define characteristics of WBS and to specify which tasks WBS can perform during Execution In General, we have three Operative Indicators such as 1. Planning Indicator 2. Account Assignment Indicator 3. Billing Indicator Planning Element: WBS Elements will be set for planning Element,if we we want a plan cost to be enabled For Example, While Creating a Project- Manufacturing an Equipment. We will Create different WBS elements for each Level such as Design, Procurement of components, Production, Assembly and Installation. During Each state some cost is incurred an...