Skip to main content

S4HANA - BDT usage in Business Partner ( Logistics and Financials)

As we are moving to Business Partner Approach  - Master Data in S4HANA ( Logistics and Financials) .

We may come across a requirement where we have to change settings and Screen Layouts of Business Partner inorder to choose our Clients requirements.

This Article emphasis on usage of BDT on Business Partner , which is used for Changing screen sequence and Field Catalog of BP.

To use the Concept of BDT , we need to understand below questions.


  1. What does BDT mean ?
  2. Is it New to S4HANA ?
  3. What are the Functions of BDT ?
  4. Where does this BDT  used?
  5. Is it a Functional Change or Technical change?
If we find answers to above questions, we can easily understand the Functionality and usage of BDT

1. What does BDT Mean?

>>>> BDT is BUSINESS DATA TOOL SET


2. Is it New to S4HANA ?

>>>>  infact BDT is not a new Concept in SAP, but it is  a new Concept in S4HANA . We have this BDT concept from Netweaver platform onwards for modules such as CRM,  GTS , TM  , EWM, and many more new dimension modules which uses BP as their master Data 

3. What are the Functions of BDT ?

>>>>> BDT enables customers to Configure Interfaces to Business partners,  
             To process changes to the BP Layouts
             Changes to the Screen-sequences in BP
             Making Field changes to the BP

4.   Where does this BDT  used?

>>>>>> Currently, it is being used in all S4HANA systems, starting from 1503/1511 till latest version. 
             In  Incentive and Commision Management
             In Claims management
             In BRF+ 

5. Is it a Functional Change or Technical change?

>>>>>>  when it was introduced Originally, it was a node in SAP Basis, later it was made very flexibility and even Functional Consultant can access it and play Around

You can refer to the Transaction from BDT Menu

BUPT --- BP Task menu

BUS6 ---  Screen Sequence

BUS7 ----  Events

BUS5   ---- Screens 

BUSC  --  Field Grouping Criteria

BUSJ  ---  Field Grouping Activities



youtube Link with video:

https://youtu.be/L1cyWrdzSXc


try from your end and provide your feedback
Good Luck
 👍

Comments

Post a Comment

Popular posts from this blog

SAP PM/CS / EAM : Refurbishment Process

Refurbishment A refurbishment order is a standard Maintenance Order type. In customizing for order, we first create an order type ( such as PM04) In the configuration we have to create a new order type in OIOA and activate this for Refurbishment process. Process flow: Business process steps 1. Damaged equipment/ spares if can be repaired will be done by the PM order of type PM04 2. Equipment/Spares needs repairing should have the item code if it is serialized item then with the serial number. 3. Item should have the valuation type for repair category too. 4. Create PR through refurbishment order for repair of the item with split valuation type of repair. Proper G/L codes and order for the repair indent should be provided in the indent 5. After approval of the requisition, the requisition and item should be send to the stores/Purchase section for further actions. 6. Stock will get updated after MIGO of the item 7. The activity type cost

TO MAKE INACTIVE CONDITION ACTIVE IN SAP

This blogger contains details on how to set an INACTIVE CONDITION  to ACTIVE while processing Sales Order content: 1.  BUSINESS REQUIREMENT Due to some legal restrictions in Russia, Russia Local Plant cannot hold any stock for the material and hence it is non valuated which means the Standard Price is Zero ( 0 $ ) The stock will be replenished from another company code and we used our Standard Third Party process  in which PR is created which will be converted to PO and when we do GR, the Standard Price of that plant is calculated in the GR. The baseline pricing structure is mapped in such a way that VPRS is calculated from the Material master and on which 15% markup is added as base price. Since the Cost price in VPRS condition is Zero Markup calculated on VPRS will be obviously calculates to Zero and both conditions were set as INACTIVE as per the condition properties 2.  CREATE SALES ORDER we will create a sales order for a material, whose standard Price

S4HANA-Project Systems Operative Indicators in WBS- CJ20N

  Use and Purpose of Operative Indicators in WBS elements When a customer Requests for ATO or ETO process where we create a Project with Integration between SD and PS ( project systems) As a First step we create a Project in CJ20N and under the Project we will Create Multiple WBS elements which has to be set for Operative Indicators This article deals with Operative Indicators in WBS elements. WE Use Operative Indicators to define characteristics of WBS and to specify which tasks WBS can perform during Execution In General, we have three Operative Indicators such as 1. Planning Indicator 2. Account Assignment Indicator 3. Billing Indicator Planning Element: WBS Elements will be set for planning Element,if we we want a plan cost to be enabled For Example, While Creating a Project- Manufacturing an Equipment. We will Create different WBS elements for each Level such as Design, Procurement of components, Production, Assembly and Installation. During Each state some cost is incurred and we