Skip to main content

SD/MM : Why there is no Accounting Document Posted after a Return Delivery (651) is posted ?


We will understand why there is no Accounting document posted after a customer Return Order and subsequent Return Delivery is Created in SAP.

What will happen to the stock, Will it never be accounted in FI books?

We all know that this behaviour is controlled in Movement type Configuration, Yes but what is the business Logic for this behavior.


We will take a look by Creating a return Delivery in SAP.

Before a Return delivery to be posted, there should be a Fulfillment Order already created for the customer n the SAP.

Assume there is a Fulfillment Order already exists in the system.

Now, with reference to the Sales Orders we will create a Return sales Order.

Return Delivery with Reference to Return Sales order



Now perform PGR and check the Accounting document, you will get an information message as this document is not relevant for account

The Main Reason for this is,

1. Movement type 651 has not account Grouping in OMJJ configuration


2. Why it is not assigned ?
So whenever we receive a Return for materials ( other than Missshipments or Wrong Delivery), the parts should be tested for Quality. Normally customer Returns the materials stating it as Dead On Arrival or Defective, In either of the cases, it should go for Quality check

Hence, whenever a Return triggers it will go for Quality test and from their it will be moved to  Unrestricted stock using different movement types.

This can be identified in the stock list MMBE as returns


If you want to directly post to  Quality Inspection Stock, you can also use Movement type 655

Hope it helps

Good Luck
👍👍

Comments

Post a Comment

Popular posts from this blog

SAP PM/CS / EAM : Refurbishment Process

Refurbishment A refurbishment order is a standard Maintenance Order type. In customizing for order, we first create an order type ( such as PM04) In the configuration we have to create a new order type in OIOA and activate this for Refurbishment process. Process flow: Business process steps 1. Damaged equipment/ spares if can be repaired will be done by the PM order of type PM04 2. Equipment/Spares needs repairing should have the item code if it is serialized item then with the serial number. 3. Item should have the valuation type for repair category too. 4. Create PR through refurbishment order for repair of the item with split valuation type of repair. Proper G/L codes and order for the repair indent should be provided in the indent 5. After approval of the requisition, the requisition and item should be send to the stores/Purchase section for further actions. 6. Stock will get updated after MIGO of the item 7. The activity type cost

TO MAKE INACTIVE CONDITION ACTIVE IN SAP

This blogger contains details on how to set an INACTIVE CONDITION  to ACTIVE while processing Sales Order content: 1.  BUSINESS REQUIREMENT Due to some legal restrictions in Russia, Russia Local Plant cannot hold any stock for the material and hence it is non valuated which means the Standard Price is Zero ( 0 $ ) The stock will be replenished from another company code and we used our Standard Third Party process  in which PR is created which will be converted to PO and when we do GR, the Standard Price of that plant is calculated in the GR. The baseline pricing structure is mapped in such a way that VPRS is calculated from the Material master and on which 15% markup is added as base price. Since the Cost price in VPRS condition is Zero Markup calculated on VPRS will be obviously calculates to Zero and both conditions were set as INACTIVE as per the condition properties 2.  CREATE SALES ORDER we will create a sales order for a material, whose standard Price

S4HANA-Project Systems Operative Indicators in WBS- CJ20N

  Use and Purpose of Operative Indicators in WBS elements When a customer Requests for ATO or ETO process where we create a Project with Integration between SD and PS ( project systems) As a First step we create a Project in CJ20N and under the Project we will Create Multiple WBS elements which has to be set for Operative Indicators This article deals with Operative Indicators in WBS elements. WE Use Operative Indicators to define characteristics of WBS and to specify which tasks WBS can perform during Execution In General, we have three Operative Indicators such as 1. Planning Indicator 2. Account Assignment Indicator 3. Billing Indicator Planning Element: WBS Elements will be set for planning Element,if we we want a plan cost to be enabled For Example, While Creating a Project- Manufacturing an Equipment. We will Create different WBS elements for each Level such as Design, Procurement of components, Production, Assembly and Installation. During Each state some cost is incurred and we