S/4HANA ; Sourcing and Procurement ---Material Number Field Length Extension


We already know there is a change in Material Length from Simplification List of Sourcing and Procurement.

Let us understand, Business scenario where this Material Length is required to extend and what are the implications.

In automotive industry, In Retail and Heavy Equipment and High-Tech Industry, it is common to have a material with more than 18 Characters


Also some IS- solution, MII has 40 characters length of Materials. When we use ECC to interface such system, we were converting the length of ECC material to suit 40 Chars length of Target system in Interface.

But when we convert our ECC system to S4HANA,  some  "IS_ Specific Modules and any other modules where the length is 40 till now are part of S4HANA. If we extend the length in S/4HANA system it is not required to do any adjustments or enhancements further.

Data base Representation of material number  is MATNR;


ECC it shows 18 Chars                                   S/4HANA   40















Configuration:-

There are two settings to Activate Extended material Functionality

1.  Activation of Extended Material Number Functionality

Navigation: --->
IMG-->CROSS APPLICATION COMPONENTS -->GENERAL APPLICATION FUNCTIONS-->FIELD LENGTH EXTENSIONS-->ACTIVATE EXTENDED FIELDS

Transaction code: - FLETS


2. Changing Material number format

Navigation: -->
IMG-->LOGISTICS GENERAL-->MATERIAL MASTER-->BASIC SETTINGS

Transaction code:   OMSL

Comments

Popular posts from this blog

SAP PM/CS / EAM : Refurbishment Process

Refurbishment A refurbishment order is a standard Maintenance Order type. In customizing for order, we first create an order type ( such as PM04) In the configuration we have to create a new order type in OIOA and activate this for Refurbishment process. Process flow: Business process steps 1. Damaged equipment/ spares if can be repaired will be done by the PM order of type PM04 2. Equipment/Spares needs repairing should have the item code if it is serialized item then with the serial number. 3. Item should have the valuation type for repair category too. 4. Create PR through refurbishment order for repair of the item with split valuation type of repair. Proper G/L codes and order for the repair indent should be provided in the indent 5. After approval of the requisition, the requisition and item should be send to the stores/Purchase section for further actions. 6. Stock will get updated after MIGO of the item 7. The activity type cost ...

TO MAKE INACTIVE CONDITION ACTIVE IN SAP

This blogger contains details on how to set an INACTIVE CONDITION  to ACTIVE while processing Sales Order content: 1.  BUSINESS REQUIREMENT Due to some legal restrictions in Russia, Russia Local Plant cannot hold any stock for the material and hence it is non valuated which means the Standard Price is Zero ( 0 $ ) The stock will be replenished from another company code and we used our Standard Third Party process  in which PR is created which will be converted to PO and when we do GR, the Standard Price of that plant is calculated in the GR. The baseline pricing structure is mapped in such a way that VPRS is calculated from the Material master and on which 15% markup is added as base price. Since the Cost price in VPRS condition is Zero Markup calculated on VPRS will be obviously calculates to Zero and both conditions were set as INACTIVE as per the condition properties 2.  CREATE SALES ORDER we will create a sales order for...

S4HANA-Project Systems Operative Indicators in WBS- CJ20N

  Use and Purpose of Operative Indicators in WBS elements When a customer Requests for ATO or ETO process where we create a Project with Integration between SD and PS ( project systems) As a First step we create a Project in CJ20N and under the Project we will Create Multiple WBS elements which has to be set for Operative Indicators This article deals with Operative Indicators in WBS elements. WE Use Operative Indicators to define characteristics of WBS and to specify which tasks WBS can perform during Execution In General, we have three Operative Indicators such as 1. Planning Indicator 2. Account Assignment Indicator 3. Billing Indicator Planning Element: WBS Elements will be set for planning Element,if we we want a plan cost to be enabled For Example, While Creating a Project- Manufacturing an Equipment. We will Create different WBS elements for each Level such as Design, Procurement of components, Production, Assembly and Installation. During Each state some cost is incurred an...